Atatürk Boulevard Renewed Alanya Breathing
Thanks to the comprehensive infrastructure works carried out by the Alanya Municipality with the 2025-2026 vision, the heart of the city gained natural gas, fiber and modern roads.
Historical Records were Broken in Infrastructure
As part of the work, 15 thousand tons of hot asphalt was poured into the region, and an asphalt pavement area of 61 thousand square meters was created. 11 thousand square meters of parquet pavement was laid for the safety and comfort of pedestrians. It was aimed to prevent possible floods by constructing 3 thousand meters of rain water line and 384 manholes to drain the water. In addition, the city's hygiene and environmental standards were raised to the highest level with the 12,500-meter clean and waste water line.
Uninterrupted Energy and Digital Transformation
Not only the road and water infrastructure, but also technological and vital comfort areas were modernized for the residents ofAlanya. While a total of 57 thousand meters of new power lines were installed, the boulevard gained a bright and safe appearance with 14 transformer kiosks and 220 lighting poles. The 21 thousand-meter fiber cable line, which will carry the city's digital infrastructure into the future, and the long-awaited 7 thousand 308-meter natural gas line have been integrated into the region. With this historic investment, Alanya has stepped into both environmentally friendly energy and high-speed communication.
#Alanya #AtatürkBulvarı #Infrastructure #Modernization #Urbanization #Urbanization #Investment
For more local news, you can visit Alanya Net News
Comments 0
Write a Comment
LATEST NEWS