1.46 Billion TL Investment from ASAT to Gazipaşa in 7 Years
Antalya Metropolitan Municipality ASAT General Directorate transferred a total of 1.46 billion TL to the infrastructure and superstructure works of Gazipaşa between 2019-2026.
Antalya Water and Wastewater (WASTE) Administration General Directorate made a total investment of 1 billion 461 million 573 thousand 202 TL in Gazipaşa district between 2019-2026. With investments including drinking water, sewerage, rainwater, wastewater and asphalt works, the infrastructure systems of the district were improved and the services offered to citizens were strengthened.
Drinking Water and Sewage Infrastructure Renewed
The highest share of investments in Gazipaşa was allocated to drinking water infrastructure. In this area, a total of 350 thousand 751 meters of drinking water lines were built by spending 708 million 563 thousand 932 TL. In the works regarding the sewer infrastructure, 55 thousand 6 meters of sewer line was laid using a resource of 168 million 858 thousand 374 TL.
Additional Resource to Rainwater and Wastewater Systems
In order to develop the stormwater infrastructure in the district, 1,852 meters of rainwater line was built with an investment of 53 million 163 thousand 878 TL. A resource of 126 million 57 thousand 849 TL was used in investments made to support wastewater services.
Budget Exceeding 400 Million TL for Asphalt and Other Works
296 million 178 thousand 354 TL was spent for the asphalt works carried out in line with the road and superstructure needs of Gazipaşa. A budget of 108 million 750 thousand 816 TL was allocated for other investments covering different service areas in the district.
#Gazipaşa #ASAT #Antalya Metropolitan Municipality #Infrastructure #Alanya #GazipaşaHaber #Antalya
For more local news, you can visit Alanya Net News
Photo Gallery