Strong Infrastructure Touch to Antalya Streets Before the Rains
ASAT teams continue their rainwater infrastructure works with a budget of 15 million lira in order to prevent floods that may occur during heavy rains throughout the city.
Antalya Metropolitan Municipality ASAT General Directorate continues its infrastructure works uninterruptedly in order to ensure safe and rapid discharge of rainwater throughout the city and to prevent water accumulation that may occur during heavy rains. Within the scope of the investments aimed at preventing the local people and drivers from being affected by adverse weather conditions, the teams increased their work hours in the field.
Grill Manufacturing in Neighborhoods Completed
As part of the work carried out, rainwater grill manufacturing was completed and put into service in Ünsal, Kültür, Şafak and Ahatlı neighborhoods of Kepez district. With the renewal of infrastructure lines, the risk of waterlogging in these areas was reduced to a minimum level.
Investment to be Avoided in addition to Critical Points
The teams, which continue their work on the busy lines of the city, continue the construction of additional rainwater grids at Karaoğlan Street and Opera Junction in Muratpaşa district. It is aimed to increase the infrastructure resilience of the city with the rainwater grid manufacturing projects carried out at a cost of approximately 15 million TL.
#ASAT #Antalya #Kepez #Muratpaşa #Infrastructure #RainWater #AntalyaHaber
For more local news, you can visit Alanya Net News
Photo Gallery
Comments 0
Write a Comment
LATEST NEWS