Alanya Municipality Introduced the Coastal Road 2nd Stage Renewal Project
Details of the project were shared with the public at the information meeting held before the Coastal Road 2nd Stage works.
An informative meeting with wide participation was held under the coordination of Alanya Municipality, before the infrastructure and superstructure works to be carried out on the Coastal Road 2nd Stage Ahmet Tokuş Boulevard. Political party representatives, chamber and association presidents, headmen, non-governmental organizations, press members and representatives of relevant institutions attended the meeting.
Comprehensive Renovation in Partnership with 8 Companies and Institutions
In the project, which will be carried out with the participation of 8 companies and relevant institutions under the coordination of the municipality, a comprehensive renovation will be carried out, from infrastructure to asphalt, from sidewalks to lighting systems. Thanks to the investment, it is aimed not only to renew the roads, but also to prevent the same routes from being dug repeatedly due to infrastructure inadequacies.
Works Begin on November 2
According to the planned calendar, the works will start on November 2; It will cover the area between the Atatürk Monument, the Highways Department, the Yalı Taxi route and the Ring Road Industrial Junction. The project is aimed to be completed by April 30, if weather conditions permit. Within the scope of the process, tradesmen on the route were informed with brochures prepared, and it was stated that the representatives attending the meeting would contribute to the process by informing their members and citizens.
#Alanya #AlanyaBelediyesi #AhmetTokuşBulvarı #SeasideRoad #AlanyaHaber #Infrastructure #AlanyaRoadWork
For more local news, you can visit Alanya Net News
Photo Gallery
Comments 0
Write a Comment
LATEST NEWS